Project Type

Modernization

Whether your freight elevator project requires a complete modification, or only updates to doors, gates and controls, EMS can create a customized solution for you.

Complete Replacement

Because a complete replacement shares similarities to new construction projects, EMS requires surveys on the space to verify the dimensions on existing drawings.

Eclips/C
Control Upgrade

To achieve smoother operation of doors, EMS has created the Eclips/C (Control) upgrade that can be applied to any freight elevator. With just one system, you can control the front and rear same-level openings. Welcome to the most advanced freight door control system in the industry.

eclips/p
Full Power Upgrade

To take the Eclips line a step further, you can upgrade to the Eclips/P (Power) and achieve powerful yet quiet operation every time. This model features adjustable gate closing speed for improved safety, and eliminates cam bounce and the need for dampening devices that can fail. There are no limit switches to adjust, and downtime and costly maintenance calls are a thing of the past.

Our Products

  • All
  • Doors
    Gates
    Mod Packages
    Vertical Bi-Parting
    Learn More
    Vertical Bi-Parting Pass Type
    Learn More
    1/3 - 2/3 Bi-Parting
    Learn More
    1/3 - 2/3 Bi-Parting Pass Type
    Learn More
    One-Section Slide Up
    Learn More
    Two-Section Slide Up
    Learn More
    Two-Section Compounding Upper Panel
    Learn More
    One-Section Gate
    Learn More
    Two-Section Compound Gate
    Learn More
    Two-Section Ratio Driven Gate
    Learn More
    One-Section "Hidden Chain" Gate
    Learn More
    Two-Section "Hidden Chain" Gate
    Learn More
    Eclips/P
    Learn More
    Eclips/C
    Learn More

    We provide solutions for every industry. learn more about some of the industries we serve.

    Industries We Serve